logo
son şirket davası hakkında

Çözüm Ayrıntıları

Created with Pixso. Evde Created with Pixso. çözümler Created with Pixso.

Case Study (Saudi Arabia) — Demolition & Industrial Scrap: Turning Oversize Pieces into Loadable, Buyer-Ready Lengths

Case Study (Saudi Arabia) — Demolition & Industrial Scrap: Turning Oversize Pieces into Loadable, Buyer-Ready Lengths

2026-02-26

1) Market Background

In Saudi Arabia, demolition and industrial maintenance scrap often arrives in irregular, heavy forms—bars, thick sections, and large plate pieces that can’t be shipped efficiently without sizing. As the market becomes more time-sensitive, yards that can produce buyer-ready lengths gain an advantage: faster loading, fewer truck delays, and fewer exceptions that require secondary handling. The trend is clear: heavy scrap processing is shifting from ad-hoc cutting to a standardized sizing routine supported by a metal guillotine shear built for consistent daily work.

2) Customer & Application Scenario

The customer needed to solve:

  • Oversize scrap creating frequent “problem pieces”

  • Slow staging because operators spent time repositioning material

  • Inconsistent output piles that were hard to stack and load

  • Dispatch delays during peak inbound periods
    They wanted a robust scrap metal cutting shear that could become the yard’s central sizing station.

3) Our Solution (Workflow + Selection Logic)

Jiangsu Wanshida Hydraulic Machinery Co., Ltd. supplied 1 set Y43L-8000 (Q43L-8000L) industrial guillotine shear. The selection emphasized a long loading room for practical feeding and strong holding for controlled cuts—critical when scrap forms vary. The yard implemented a repeatable flow:
Crane/Loader Feed → Hold → Cut → Discharge → Stack → Load.
This reduced secondary handling and helped the customer keep output uniform even when the incoming batch changed.

4) Product Specification Table 

Item Specification (Y43L-8000 / Q43L-8000L)
Cutting force 4000×2 kN (800-ton class), stroke 700 mm, 2 cutting cylinders
Holding force 1100 kN, 2 pcs
Side force 750 kN, 2 pcs
Loading room 8000 × 1950 × 900 mm
Cutting width / min mouth 2000 / 500 mm
Cutting frequency 3 times/min (theory)
Cutting angle
System pressure 27.5 MPa
Motor power 225 kW, 6 motors (45 kW × 6)
Pump sets 6 sets, 250YCY14-1B
Cooling Oil cooler + water tower + cycle water pump
Weight ~92,000 kg

5) Customer Feedback (Operational Results)

They reported fewer “exception pieces” requiring extra steps. Staging improved because cut output formed more consistent piles. Loading became smoother, and the cutting station stopped being a last-minute rush point before dispatch.

6) Key Takeaway

For demolition and industrial scrap, a scrap guillotine shear helps convert irregular heavy pieces into consistent, shippable lengths—reducing rework and stabilizing daily operations.

7)FAQ 

Q1: What’s the benefit of a long loading room?
It improves feeding practicality and reduces repositioning time for awkward scrap pieces.
Q2: How do holding and side cylinders improve results?
They stabilize scrap during cutting, improving cut consistency and reducing interruptions.
Q3: What’s the best way to plan installation space?
Design clear lanes for feed, discharge, and stacking to avoid cross-traffic.

 

CTA: Share your scrap shapes, max dimensions, and feeding method. We’ll recommend a guillotine shear setup optimized for your yard flow.

son şirket davası hakkında
Çözüm Ayrıntıları
Created with Pixso. Evde Created with Pixso. çözümler Created with Pixso.

Case Study (Saudi Arabia) — Demolition & Industrial Scrap: Turning Oversize Pieces into Loadable, Buyer-Ready Lengths

Case Study (Saudi Arabia) — Demolition & Industrial Scrap: Turning Oversize Pieces into Loadable, Buyer-Ready Lengths

1) Market Background

In Saudi Arabia, demolition and industrial maintenance scrap often arrives in irregular, heavy forms—bars, thick sections, and large plate pieces that can’t be shipped efficiently without sizing. As the market becomes more time-sensitive, yards that can produce buyer-ready lengths gain an advantage: faster loading, fewer truck delays, and fewer exceptions that require secondary handling. The trend is clear: heavy scrap processing is shifting from ad-hoc cutting to a standardized sizing routine supported by a metal guillotine shear built for consistent daily work.

2) Customer & Application Scenario

The customer needed to solve:

  • Oversize scrap creating frequent “problem pieces”

  • Slow staging because operators spent time repositioning material

  • Inconsistent output piles that were hard to stack and load

  • Dispatch delays during peak inbound periods
    They wanted a robust scrap metal cutting shear that could become the yard’s central sizing station.

3) Our Solution (Workflow + Selection Logic)

Jiangsu Wanshida Hydraulic Machinery Co., Ltd. supplied 1 set Y43L-8000 (Q43L-8000L) industrial guillotine shear. The selection emphasized a long loading room for practical feeding and strong holding for controlled cuts—critical when scrap forms vary. The yard implemented a repeatable flow:
Crane/Loader Feed → Hold → Cut → Discharge → Stack → Load.
This reduced secondary handling and helped the customer keep output uniform even when the incoming batch changed.

4) Product Specification Table 

Item Specification (Y43L-8000 / Q43L-8000L)
Cutting force 4000×2 kN (800-ton class), stroke 700 mm, 2 cutting cylinders
Holding force 1100 kN, 2 pcs
Side force 750 kN, 2 pcs
Loading room 8000 × 1950 × 900 mm
Cutting width / min mouth 2000 / 500 mm
Cutting frequency 3 times/min (theory)
Cutting angle
System pressure 27.5 MPa
Motor power 225 kW, 6 motors (45 kW × 6)
Pump sets 6 sets, 250YCY14-1B
Cooling Oil cooler + water tower + cycle water pump
Weight ~92,000 kg

5) Customer Feedback (Operational Results)

They reported fewer “exception pieces” requiring extra steps. Staging improved because cut output formed more consistent piles. Loading became smoother, and the cutting station stopped being a last-minute rush point before dispatch.

6) Key Takeaway

For demolition and industrial scrap, a scrap guillotine shear helps convert irregular heavy pieces into consistent, shippable lengths—reducing rework and stabilizing daily operations.

7)FAQ 

Q1: What’s the benefit of a long loading room?
It improves feeding practicality and reduces repositioning time for awkward scrap pieces.
Q2: How do holding and side cylinders improve results?
They stabilize scrap during cutting, improving cut consistency and reducing interruptions.
Q3: What’s the best way to plan installation space?
Design clear lanes for feed, discharge, and stacking to avoid cross-traffic.

 

CTA: Share your scrap shapes, max dimensions, and feeding method. We’ll recommend a guillotine shear setup optimized for your yard flow.